The garage and most other outbuildings are removed down to grade. The contractor is doing a good job of segregating material that can be reused or recycled.
28Feb2019 – Garage cleared to slab
28Feb2019 – Woodshed cleared to slab
28Feb2019 – Salvaged glulam beam
28Feb2019 – Old shop cleared to slab
28Feb2019 – Erosion control at shop
28Feb2019 – Old septic system west of house
28Feb2019 – Site cleared west of house
28Feb2019 – Extent of building site
28Feb2019 – Erosion control along east boundary
February 28, 2019 morning
The shed behind the farmhouse has been removed and most of the garage is down. The contractor’s office trailer was moved in.
28Feb2019 – Looking south along driveway
28Feb2019 – Looking east at site
28Feb2019 – Looking southeast at site
28Feb2019 – Carriage house removed
28Feb2019 – Most of garage down
28Feb2019 – Contractor office trailer
February 27, 2019
Demolition of the garage began today. Trees were removed from one side of the driveway to allow widening of the driveway.
27Feb2019 – Peeling plywood from garage roof
27Feb2019 – Demolishing the garage
27Feb2019 – Salvaged fence materials
27Feb2019 – Workshop down
27Feb2019 – Trees removed for widening driveway
27Feb2019 – East row of trees removed
February 25 & 26, 2019
The woodshed is down and work began on removing the carriage house (the small shed behind the farmhouse).
25Feb2019 – Woodshed down
26Feb2019 – Removing fence
26Feb2019 – Gravel pad for contractor trailer
26Feb2019 – Farmhouse garden plot
26Feb2019 – Carriage house board salvage
26Feb2019 – Carriage house
26Feb2019 – Workshop and woodshed
February 24, 2019
Work began on recovering material from the woodshed prior to demolition.