The garage and most other outbuildings are removed down to grade. The contractor is doing a good job of segregating material that can be reused or recycled.
February 28, 2019 morning
The shed behind the farmhouse has been removed and most of the garage is down. The contractor’s office trailer was moved in.
February 27, 2019
Demolition of the garage began today. Trees were removed from one side of the driveway to allow widening of the driveway.
February 25 & 26, 2019
The woodshed is down and work began on removing the carriage house (the small shed behind the farmhouse).
February 24, 2019
Work began on recovering material from the woodshed prior to demolition.